“Commissioning and maintenance of a clean agent suppression system in Alberta should follow the requirements set by NFPA 2001 (Clean Agent Fire Extinguishing Systems). As part of these requirements, it is necessary to conduct a Room Integrity Test during the commissioning of a clean agent system to ensure that the suppressions system is performing as per the intern of the deism. The enclosure where this system is installed should then be inspected … ”