Suncor Foam Suppression System Upgrade

Completion Date

Location

Industry

Suncor Foam Suppression System Upgrade

Rotaflow was awarded this turnkey project in 2019 to upgrade the foam suppression system at one of the Suncor plants in Northern Alberta.

The scope included replacement of two foam concentrate pumps, controllers, motors, valves, instruments, electrical cables, modification of pump pads, modification and re-routing of piping, updating fire alarm system logic and replacing foam proportioner and fire water system isolation valves.

Rotaflow provided an end-to-end solution that included regulatory compliance review, scoping study, detailed engineering design, preparation of Construction Work Package, procurement of material, construction and finally commissioning of this system.

Through a multi-discipline approach, Rotaflow had successfully completed this turn-key project and handed over the care, custody and control of this system to Suncor Energy Inc. in early 2020.

Related Projects

grocery-store-development-edmonton-1

Fire Sprinkler System Design and Construction – Grocery Store Development, Edmonton

underground-fire-standpipe-system-edmonton-lrt-1

Underground Fire Standpipe System Installation – LRT Expansion Project, Edmonton, Alberta

Fire water deluge system – railcar side view showing nozzle spray coverage

Fire Water Deluge System – Railcar Loading Station & Pressure Vessel Protection

new-car-dealership-south-edmonton-1

Fire Protection System Design and Installation – New Car Dealership, South Edmonton

Rotaflow facility at sunset

Need Help With Your Project?

From scoping and detailed design to construction and maintenance, if you’ve got questions or ideas you would like to share, send a message.