TC Energy Firewater Pump House Sprinkler System Design

fire pump house

TC Energy Firewater Pump House Sprinkler System Design Rotaflow was awarded this scope by TC Energy in 2019 to provide engineering design for sprinkler system of a fire pump house in one of their facilities in Northern Alberta. This included preparation of layout drawings and hydraulic calculation for the sprinkler system, conducting sprinkler system commissioning […]

Suncor Fire Water Pumps Replacement

Fire water pump house with red firewater piping and pumps at Suncor

Suncor Fire Water Pumps Replacement Rotaflow was awarded the scope by Suncor in 2019 to assess the condition of fire water pumps in two plants in Northern Alberta and identify if they reached their end of the life cycle. As per the finding of this assessment, Rotaflow was awarded to proceed with the replacement of […]

Industrial Utility Lines Maintenance & Repair

Industrial Utility Lines Maintenance & Repair Rotaflow has awarded a maintenance contract by Suncor in 2019 to take over the repair and maintenance of underground industrial utility lines at one of their facilities in Northern Alberta. The scope includes inspection and repair of firewater, potable water, sanitary sewer, Natural Gas, and Diesel Lines at this […]