Fire Sprinkler System Design and Construction – Grocery Store Development, Edmonton

Fire Sprinkler System Design and Construction – Grocery Store Development, Edmonton Project Overview: Rotaflow was selected to provide the fire sprinkler system design and construction for a new grocery store development in Edmonton, Alberta. Delivered as a design-build project, Rotaflow was responsible for designing a fire protection system that met the building’s operational requirements while […]
Underground Fire Standpipe System Installation – LRT Expansion Project, Edmonton, Alberta

Underground Fire Standpipe System Installation – LRT Expansion Project, Edmonton, Alberta Project Overview: Rotaflow was selected to fabricate, test, protect, and install a critical underground fire standpipe system for a major LRT expansion project in Edmonton, Alberta. The system was designed to provide long-term fire protection infrastructure within tunnel environments, helping support the safety of […]
Clean Agent Fire Suppression System Installation – Industrial Facility, Northern Alberta

Clean Agent Fire Suppression System Installation – Industrial Facility, Northern Alberta Project Overview: Rotaflow was engaged to deliver a clean agent fire suppression system installation for an industrial facility in Northern Alberta, focused on protecting five Motor Control Centers (MCCs) containing critical electrical infrastructure. Because these assets play an essential role in day-to-day operations, the […]
Fire Protection System Installation – Commercial Fitness Facility, South Edmonton

Fire Protection System Installation – Commercial Fitness Facility, South Edmonton Project Overview: In one of Rotaflow’s recent projects in South Edmonton, our team was engaged to carry out the installation of a complete fire protection system for a newly constructed commercial fitness and wellness facility located in South Edmonton. The development is designed as a […]
Firewater Hydrants / Valve Replacements

Firewater Hydrants / Valve Replacements Scope of Project: Shoring / Excavations / Fusing / HEIs / Bolt-ups / Backfill Location and Year: Suncor East Tank Farm – 2020 to current Project Challenges and Solutions: Rotaflow was asked to replace numerous Hydrants and Valves in the ETF. The scope had to be done in sequence, so […]
28″ HDPE / 24″ CS Firewater Jumper Line

28″ HDPE / 24″ CS Firewater Jumper Line Scope of Project : Excavation / Shoring / Fusing / HDD (Horizontal Directional Drilling ) / Hydro-Testing / HEI’s / Tie-ins / Bolt Ups / Backfill / Cathodic Protection / Frost Protection Location and Year : Suncor Firebag – 2023 Project Challenges and solutions : Rotaflow was […]
Sanitary Sewer Repair

Sanitary Sewer Repair Scope of Project: Shoring / Excavations / Pipe Bursting / Isolation bags / Fusing / HEI’s / Monitoring / Backfill Location and Year: Suncor Base Plant – 2022 Project Challenges and Solutions: Rotaflow was awarded the SOW to repair a damaged section of the sanitary sewer system, which was on […]
Main Fire Water Pump Replacement

Main Fire Water Pump Replacement Project Undertook the entire GC scope including engineering and procurement support, construction and commissioning (Replacement in Kind) of 5000gpm Fire Water Pump House. Project came in 1% under budget No safety incidents or issues arose during the project Many changes during the project execution
Flow Testing

Rotaflow Flow Testing All fire pumps are required by code to be annually tested to confirm their performance. This video is an annual flow test of a fire pump using our flow test trailer. The flow test trailer provides accurate results, decreases overall test time, and de-chlorinates testing water
Suncor Fire Water Pump House Construction

Suncor Fire Water Pump House Construction Rotaflow was awarded this scope by Suncor in 2018 to replace three existing firewater pump systems at a Firewater pump house located in northern Alberta. This included replacing gear drives, diesel engines, pump controllers, diesel fuel storage tanks and associate equipment, modification of existing pump house building, pump pad […]