Temporary Drain Project
Scope of Project: Fusing / Fabrication / Installation
Location and Year: Albian Sands – 2023
Project Challenges and Solutions: Rotaflow was awarded the SOW to fuse 12” and 20” HDPE lines around a Tank for drainage. The challenges were working under pipe racks a go nd multiple trades taking a tank down. We used small equipment to go under the racks as well as numerous spotters for safety. Job went very well.