28″ HDPE / 24″ CS Firewater Jumper Line

image

Scope of Project :

Excavation / Shoring / Fusing / HDD (Horizontal Directional Drilling ) / Hydro-Testing / HEI’s / Tie-ins / Bolt Ups / Backfill / Cathodic Protection / Frost Protection

Location and Year : Suncor Firebag – 2023

Project Challenges and solutions :

Rotaflow was awarded the SOW and worked with the client to achieve a better construction strategy for future maintenance issues and HDD routing. Some of the challenges were permitting which Rotaflow had to modify to make the scope more practical for safety and production as well as dealing with some unknown utilities in the excavation area. Rotaflow recommended on performing more hydrovac slot trenches which was accepted and there were no line strikes during this SOW.