Firewater Hydrants / Valve Replacements

image

Scope of Project: Shoring / Excavations / Fusing / HEIs / Bolt-ups / Backfill

Location and Year: Suncor East Tank Farm – 2020 to current

Project Challenges and Solutions: Rotaflow was asked to replace numerous Hydrants and Valves in the ETF. The scope had to be done in sequence, so when performing the actual replacement, the plant was not without any Firewater for too long. We assisted in running Jumpers from hydrant to hydrant.