Fire Sprinkler System Design and Construction – Grocery Store Development, Edmonton

Fire Sprinkler System Design and Construction – Grocery Store Development, Edmonton Project Overview: Rotaflow was selected to provide the fire sprinkler system design and construction for a new grocery store development in Edmonton, Alberta. Delivered as a design-build project, Rotaflow was responsible for designing a fire protection system that met the building’s operational requirements while […]
Fire Water Deluge System – Railcar Loading Station & Pressure Vessel Protection

Fire Water Deluge System – Railcar Loading Station & Pressure Vessel Protection Project Overview: Rotaflow was engaged to complete the fire water deluge system design for a major industrial project within the Alberta Industrial Heartland. The project focused on protecting railcar loading stations and pressure vessels in a new greenfield development associated with oil and […]
Fire Protection System Design and Installation – New Car Dealership, South Edmonton

Fire Protection System Design and Installation – New Car Dealership, South Edmonton Project Overview: Rotaflow was engaged to provide the design and installation of a new fire protection system for a newly constructed car dealership in South Edmonton. The project involved multiple fire protection systems serving different areas of the facility, including the showroom, retail […]
Fire Sprinkler System Installation – New School, North Edmonton

Fire Sprinkler System Installation – New School, North Edmonton Project Overview: Rotaflow is currently completing the installation of a brand new fire sprinkler system for a new school development in North Edmonton. As part of this project, Rotaflow has been involved not only in the field installation, but also in the design of the sprinkler […]
Fire Protection – Deluge System – Blast-Resistant Building, Oil & Gas Sector

Fire Protection – Deluge System – Blast-Resistant Building, Oil & Gas Sector Project Overview: Rotaflow was brought in to support a specialized project in the oil and gas sector, involving Designing, construction of a blast-resistant building and the installation of a deluge piping, Installation & testing Fire alarm, Commissioning support at site. This type of […]
Industrial Oil Plant – 250 ft Horizontal Directional Drilling

Overview of the 250-foot horizontal directional drilling project at an industrial oil plant (HDD). A 250-foot Horizontal Directional Drilling (HDD) installation for a 28-inch HDPE pipeline at an industrial oil facility was successfully finished by Rotaflow. Rotaflow’s crew used HDD technology to drill a 42-inch bore hole so that the pipeline could be installed underground […]
Arc Flush Study for the Installation of Permanent Power in Tailing Facility

Arc Flush Study for the Installation of Permanent Power in Tailing Facility Scope of Work- Rotaflow conducted an arc flash study for the installation of permanent power for an Oil & Gas Tailings facility which encompasses the circuit breaker at switchgear and all downstream equipment including MFT drying and MPSU polymer system. This study provided […]
Detailed Electrical & Instrumentation Engineering Design for a Cold Process Water Unit

Detailed Electrical & Instrumentation Engineering Design for a Cold Process Water Unit Scope of Work- Rotaflow performed a Pre-DBM study for Gland and Tempering Water Pumping System for an Oil & Gas upstream Plant Cold Process Water unit(CPW) for an Oil & Gas upstream unit Cold Process Water unit. The process study provided engineering recommendations […]
Modification of Existing Barges – Oil Sand Mining Facility

Modification of Existing Barges – Oil Sand Mining Facility Scope of Work- Replacement of existing pump/motors located on the electric Barge and installation of six vertical turbine water pump/motor assembly, Knife gate valves with Electrical actuators, Magnetic/Cidra flow meters and pressure transmitters along with Pressure gauges. Instrumentation on pond water lines was needed to control […]
Main Fire Water Pump Replacement

Main Fire Water Pump Replacement Project Undertook the entire GC scope including engineering and procurement support, construction and commissioning (Replacement in Kind) of 5000gpm Fire Water Pump House. Project came in 1% under budget No safety incidents or issues arose during the project Many changes during the project execution